DESCRIPTION:
The company has been a technical consultant of HYGEIA hospital since 1992. Within the period 1992-2003, a total renovation of all MEP installations and network was carried out, while new intensive care units, surgical facilities, laboratories, etc. were established. During this period the company coordinated all the studies assigned to it, while at the same time as a Technical Consultant, managed the contracts of all construction and supervision of the overall project. A highlight has been the fact that the redesign was carried out following specific phases so as not to interrupt the normal operation of the hospital.

PRINCIPLE OF THE PROJECT: HYGEIA SA

LOCATION: Marousi, Athens

BUDGET: € 10.450.000

SERVICES: Complete MEP installations design.

COMMENCEMENT - COMPLETION: 1992 - 2006