LINE 4: PANORMOU-MAROUSI
The project concerns the MEP work in advanced concept design (ACD) phase for the north extension of metro line 4 Panormou-Marousi (9018m) which includes the following stations:
• Faros
• Filothei
• Sidera
• OAKA
• Paradisos
• Marousi
BUDGET: 70,000,000 EU
COMMENCEMENT-COMPLETION: 2003-2005

LINE 3: AIGALEO-PIREAUS
The project concerns the MEP work in Advanced concept design (ACD) and general final design (GFD)phase for the south extension of the existing metro line 3 Aigaleo-Pireaus (8246m) which includes the following stations:
• Haidari
• Ag. Varvara
• Koridalos
• Nikea
• Tabouria
• Pireaus
COMMENCEMENT-COMPLETION: 2005-2007

LINE 2: AL. PANAGOULI-ELLINIKO
The project concerns the MEP work in preliminary, final and detailed design phase for the south extension of metro line 2 Al. Panagouli-Elliniko (5449m) which includes the following stations:
• Ilioupoli
• Argiroupoli
• Elliniko
• Elliniko Depot
BUDGET: 29,000,000 EU
COMMENCEMENT-COMPLETION: 2003-2006

LINE 4: PANEPISTIMIO-TRALLEON
The project concerns the MEP work in advanced concept design (ACD) phase for the north extension of metro line 4 Panepistimio-Tralleon (6392m) which includes the following stations:
• Panepistimio
• Exarheia
• Alexandras
• Dikastiria
• Kipseli
• Galatsi
• Tralleon
BUDGET: 62,000,000 EU
COMMENCEMENT-COMPLETION: 2003-2005

PRINCIPLE OF THE PROJECT: ATTIKO METRO S.A

LOCATION: Athens, Greece

SERVICES:
• Drainage and water supply
• Fire Fighting System
• Lifts and escalators
• HVAC
• Over track exhaust system
• Lighting design for tunnels and stations
• Overall low voltage power supply (400V) system
• Power supply 20kV
• Earthing
• SCADA of stations and shafts (BACS)
• Fire alarm system
• Access control system